Final | 10/9/2002 | 10/15/2002 | 10/15/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/09/2002 at 12:36:20. Contact: ###-####. Previosly passed by 411. 10/15/2002 11:42:02 AM
|
Pressure Test | 10/9/2002 | 10/15/2002 | 10/15/2002 | A | DONE |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/09/2002 at 12:36:48. Contact: ###-####. already tagged. 10/15/2002 11:41:37 AM
|
Final | 10/8/2002 | 10/8/2002 | 10/8/2002 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/08/2002 at 10:50:30. Contact: ###-####. home owner removed door from laundry room to house for comb air requirements 10/8/2002 5:59:15 PM
|
Final | 10/6/2002 | 10/7/2002 | 10/7/2002 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/06/2002 at 20:34:33. Contact: ###-####.
need new gas gauge, and need to see furnace on inside 10/7/2002 10:21:01 AM
|