Pressure Test | 10/1/2002 | 10/8/2002 | 10/8/2002 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/01/2002 at 16:42:44. Contact: ###-####.
|
Rough-in | 10/1/2002 | 10/8/2002 | 10/8/2002 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via He10/01/2002 at 16:42:04. Contact: ###-####...boise ave..left on old oak 10/8/2002 12:04:22 PM...f/p 10/8/2002 12:12:33 PM
|
Final | 10/1/2002 | 10/2/2002 | 10/1/2002 | A | CANC |
Steven Webb
|
|
|
a-1 f/p ###-#### Disp set to [CANC] by a contractor via Hello! on 10/01/2002 at 16:44:24.
|
Pressure Test | 10/1/2002 | 10/2/2002 | 10/1/2002 | A | CANC |
Steven Webb
|
|
|
a-1 f/p ###-#### Disp set to [CANC] by a contractor via Hello! on 10/01/2002 at 16:43:51.
|