Pressure Test | 10/3/2002 | 10/4/2002 | 10/4/2002 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/03/2002 at 13:33:44. Contact: ###-####. NOBODY HOME..LEFT NOTICE 10/4/2002 11:12:57 AM
|
Pressure Test | 10/4/2002 | 10/4/2002 | 10/4/2002 | P | PART |
Dixie Fellows
|
|
|
(brandon) please call for access; Phone #: ###-#### Internet Inspection Request from: Annette Moore GAS DONE BY INT GAS....NEED LIGHT AT ENTRANCE TO CHECK EQUIP IN CRAWL 10/4/2002 2:34:50 PM
|
Pressure Test | 10/2/2002 | 10/3/2002 | 10/3/2002 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/02/2002 at 09:03:17. Contact: ###-####...ciurtis..left on kootenai 10/3/2002 8:57:07 AM they haven't even started the job 10/3/2002 9:41:47 AM
|