Final | 2/14/2003 | 2/18/2003 | 2/18/2003 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 2/14/2003 at 8:37:59 AM. Contact: ###-####.
|
Final | 2/7/2003 | 2/10/2003 | 2/10/2003 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 2/7/2003 at 9:56:34 AM. Contact: ###-####. vent regulators outside boiler room...need temp rating on roof membrane around b-vent 2/10/2003 12:26:19 PM
|
Rough-in | 1/6/2003 | 1/8/2003 | 1/8/2003 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/06/2003 at 11:55:03. Contact: ###-####. ok to cover ceiling under shell and core..talked to fred about changing access doors to s/f dampers..gen cont will get specs on vent changes to boilers 1/8/2003 9:34:50 AM
|
Rough-in | 12/18/2002 | 12/20/2002 | 12/20/2002 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/18/2002 at 09:03:56. Contact: ###-####.
|