Final | 2/20/2003 | 2/20/2003 | 2/20/2003 | A | PASS |
Dave Hannah
|
|
|
|
Final | 12/20/2002 | 12/20/2002 | 12/20/2002 | P | FAIL |
Alan Hauser
|
|
|
protection post in wrong spot, move for full protection of furnace 12/20/2002 5:33:44 PM
|
Rough-in | 10/11/2002 | 10/11/2002 | 10/11/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 10/11/2002 at 05:11:22. Contact: ###-####.
|
Rough-in | 10/8/2002 | 10/8/2002 | 10/8/2002 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/08/2002 at 04:32:18. Contact: ###-####. pull plastic and insul away from vent pipe 10/8/2002 11:13:10 AM
|