Final | 2/6/2003 | 2/6/2003 | 2/6/2003 | P | PASS |
Alan Hauser
|
|
|
greg access gar code is 4444--re-insp; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Final | 12/17/2002 | 12/17/2002 | 12/17/2002 | P | FAIL |
Dave Hannah
|
|
|
GREG ###-#### 4444 ENTER ON THE GARAGE PAD install gaurd post infront of furnace 12/17/2002 2:41:20 PM
|
Pressure Test | 10/18/2002 | 10/18/2002 | 10/18/2002 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/18/2002 at 07:49:42. Contact: ###-####.
|
Pressure Test | 10/16/2002 | 10/17/2002 | 10/17/2002 | A | FAIL |
Alan Hauser
|
|
|
gas test failed. 10/17/2002 11:02:42 AM
|
Pressure Test | 10/16/2002 | 10/16/2002 | 10/16/2002 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/16/2002 at 10:39:43. Contact: ###-####.Did not know I had this when i did the framing inspection i have set it back up for an am inspection. as i am know at the other side of town and it is 5:10 pm. and i can not go back due to no authorized over time. 10/16/2002 5:11:02 PM
|
Pressure Test | 10/8/2002 | 10/9/2002 | 10/9/2002 | A | FAIL |
Dave Hannah
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
Rough-in | 10/8/2002 | 10/9/2002 | 10/9/2002 | A | PASS |
Dave Hannah
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|