Rough-in | 11/4/2002 | 11/5/2002 | 11/5/2002 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/04/2002 at 20:54:09. Contact: ###-####.
ducts changed out, ok, need to go to exterior, check later, did not leave sticker, leave at frame 11/5/2002 2:44:17 PM
|
Final | 10/31/2002 | 11/4/2002 | 11/4/2002 | A | FAIL |
Alan Hauser
|
|
|
change out exhaust fan ducts to class 1 or class 0 duct, 2nd flr. attic 11/4/2002 1:43:34 PM
|