Final | 8/28/2003 | 8/29/2003 | 8/29/2003 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/28/2003 at 1:12:31 PM. Contact: ###-####.
|
Final | 8/27/2003 | 8/28/2003 | 8/28/2003 | P | FAIL |
Dave Lightfoot
|
|
|
THANK YOU; Phone #: ###-#### Internet Inspection Request from: Becky Sucher
|
Final | 8/26/2003 | 8/27/2003 | 8/27/2003 | P | FAIL |
Dixie Fellows
|
|
|
thank you; Phone #: ###-#### Internet Inspection Request from: Becky Sucher
|
Rough-in | 2/3/2003 | 2/3/2003 | 2/3/2003 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/03/2003 at 08:00:53. Contact: ###-####.
|
Rough-in | 1/31/2003 | 1/31/2003 | 1/31/2003 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/31/2003 at 08:11:38. Contact: ###-####. COMB AIR TO BE HARD PIPE NOT FLEX 1/31/2003 7:30:37 PM
|
Rough-in | 1/30/2003 | 1/30/2003 | 1/30/2003 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/30/2003 at 09:05:53. Contact: ###-####. CORRECTIONS NOT DONE 1/30/2003 5:11:14 PM
|
Rough-in | 1/28/2003 | 1/29/2003 | 1/29/2003 | P | NH |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/28/2003 at 16:03:31. Contact: ###-####. no access at 1:54 pm 1/29/2003 1:55:07 PM
|
Rough-in | 1/27/2003 | 1/28/2003 | 1/28/2003 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/27/2003 at 13:22:14. Contact: ###-####. cn posted 1/28/2003 9:55:48 AM
|
Rough-in | 1/17/2003 | 1/21/2003 | 1/21/2003 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/17/2003 at 15:19:46. Contact: ###-####...orchard..left on spaulding 1/21/2003 8:35:20 AM wrong permit called in 1/21/2003 11:22:22 AM
|