Final | 7/11/2003 | 7/11/2003 | 7/11/2003 | P | PASS |
Alan Hauser
|
|
|
CHRIS; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
Final | 7/10/2003 | 7/10/2003 | 7/10/2003 | P | NH |
Jim Storey
|
|
|
CHRIS ###-#### CHRIS ###-#### called # not in service. no access. 7/10/2003 12:55:16 PM
|
Final | 2/11/2003 | 2/11/2003 | 2/11/2003 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/11/2003 at 10:09:36 AM. Contact: ###-####. access code 8124 on back of retro homes sign c/n on site 2/11/2003 1:13:49 PM
|
Rough-in | 11/18/2002 | 11/19/2002 | 11/19/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/18/2002 at 11:43:21. Contact: ###-####.
|
Rough-in | 11/15/2002 | 11/15/2002 | 11/15/2002 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/15/2002 at 08:40:08. Contact: ###-####. crew used wrong gaurd plates for gas piping still need 6'' of clearance from singal wall vent pipe to side wall need to strape b-vent in atticc so it cant move back on to flix duct also return air duct is now been pinched reducing size so clearance can be maintained for bvent 11/15/2002 2:35:10 PM
|
Pressure Test | 11/12/2002 | 11/12/2002 | 11/12/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/12/2002 at 09:45:35. Contact: ###-####.
|
Rough-in | 11/12/2002 | 11/12/2002 | 11/12/2002 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/12/2002 at 09:45:07. Contact: ###-####.c/n on site 11/12/2002 3:06:05 PM
|
Pressure Test | 11/7/2002 | 11/7/2002 | 11/7/2002 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/07/2002 at 08:58:04. Contact: ###-####.
|
Rough-in | 11/7/2002 | 11/7/2002 | 11/7/2002 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/07/2002 at 08:57:37. Contact: ###-####.crew still working on mec rough in 11/7/2002 3:32:56 PM
|