Final | 7/18/2013 | 7/18/2013 | 7/18/2013 | P | PASS |
Alan Hauser
|
|
|
gas piping correct size
|
Mec-Aging Inspection | 7/18/2013 | 7/18/2013 | 7/18/2013 | | CANC |
Alan Hauser
|
|
|
|
Pressure Test | 10/23/2002 | 10/24/2002 | 10/24/2002 | A | FAIL |
Dave Hannah
|
|
|
piping is onder sized line from meter to first funace ok but will not carry suply for second funace repipe 10/24/2002 11:36:46 AM
|