Final | 1/10/2003 | 1/13/2003 | 1/13/2003 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/10/2003 at 15:25:34. Contact: .
|
Rough-in | 12/5/2002 | 12/6/2002 | 12/6/2002 | A | PASS |
Jim Storey
|
|
|
|
Rough-in | 12/4/2002 | 12/5/2002 | 12/5/2002 | A | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/04/2002 at 16:56:56. Contact: ###-####.
|
Rough-in | 12/5/2002 | 12/5/2002 | 12/5/2002 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/05/2002 at 09:06:47. Contact: .work in progess rolled over for am on 12/6 12/5/2002 2:38:35 PM will perform with hvac that was not ready am 12/6 12/5/2002 2:41:06 PM
|