Pressure Test | 11/11/2002 | 11/12/2002 | 11/12/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/11/2002 at 10:51:02. Contact: ###-####. ...this permit for existing gas line only...no equipment inspected 11/12/2002 10:12:48 AM
|
Final | 11/8/2002 | 11/8/2002 | 11/8/2002 | P | FAIL |
Dixie Fellows
|
|
|
door on east end is open; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
Pressure Test | 11/8/2002 | 11/8/2002 | 11/8/2002 | P | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung guage on 16lb...called contractor 11/9/2002 1:34:47 PM
|
Conference | 11/4/2002 | 11/4/2002 | 11/4/2002 | P | PART |
Russ Owen
|
|
|
called and talked with amber , told her to have the gas line pressurized and recall for another inspection, and we would consider gas line as existing piping with only repairs made to hold new pressure test.also talked to my suppervisor. 11/4/2002 4:58:36 PM
|
Pressure Test | 10/24/2002 | 10/24/2002 | 10/24/2002 | P | FAIL |
Russ Owen
|
|
|
###-#### door on east end of building is open. need btu ratings and distances for gas line several feet of 3/4 to some older units. c/n posted on meter. 10/24/2002 1:45:55 PM
|