Final | 9/12/2003 | 9/16/2003 | 9/16/2003 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/12/2003 at 2:53:02 PM. Contact: ###-####. main gate locked 9/16/2003 7:48:50 AM
|
Final | 9/16/2003 | 9/16/2003 | 9/16/2003 | P | PASS |
Tom Arcoraci
|
|
|
Final inspection. A-1 technician will be out there until 4:00p.m. Call with any problems. Thanks, April; Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
Rough-in | 1/30/2003 | 1/30/2003 | 1/30/2003 | P | PART |
Dixie Fellows
|
|
|
Huge Rough-in. If you have any questions regarding this job, please call Brad Allison (journeyman on job)
###-####; Phone #: ###-#### Internet Inspection Request from: Carol Rasmusssen... 1/30/2003 3:01:16 PM ALL R/I OK..WILL NEED TO CHECK SQUIRREL CAGE EXHAUST IN ATTIC AT FINAL..ACCESS IN HALLWAY BY MASTER BEDROOM 1/30/2003 3:02:04 PM
|
Pressure Test | 1/24/2003 | 1/24/2003 | 1/24/2003 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/24/2003 at 06:52:22. Contact: ###-####.
|
Rough-in | 1/24/2003 | 1/24/2003 | 1/24/2003 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/24/2003 at 06:52:05. Contact: ###-####. not ready 1/24/2003 12:39:15 PM. called A-1told them job needs to be completed, therre are ducts in attic space that have not been connected. 1/24/2003 12:42:37 PM
|
Pressure Test | 10/24/2002 | 10/25/2002 | 10/25/2002 | A | PASS |
Dixie Fellows
|
|
|
###-####..off franklin before five mile 10/25/2002 8:53:55 AM..60lb..u/g test behind out buildings to the house ok 10/25/2002 10:34:21 AM
|