Final | 1/2/2003 | 1/3/2003 | 1/3/2003 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/02/2003 at 15:37:43. Contact: ###-####.
|
Final | 1/2/2003 | 1/3/2003 | 1/3/2003 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/02/2003 at 15:37:43. Contact: ###-####.
|
Rough-in | 11/5/2002 | 11/5/2002 | 11/5/2002 | P | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
Pressure Test | 11/1/2002 | 11/1/2002 | 11/1/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/01/2002 at 09:23:32. Contact: ###-####.
|
Rough-in | 11/1/2002 | 11/1/2002 | 11/1/2002 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/01/2002 at 09:23:21. Contact: ###-####. C/N....Dryer vent duct more than (min) 14' 2 ells. (24' 4 Ells.) 11/1/2002 3:24:55 PM
|