Final | 10/11/2003 | 10/14/2003 | 10/14/2003 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/11/2003 at 4:53:51 PM. furnace to be 3ins above grade provide service clearance per manufacture 10/14/2003 4:32:24 PM 10/14/2003 4:32:29 PM provide vent and window clearance 10/14/2003 4:33:20 PM
|
Final | 3/2/2003 | 3/3/2003 | 3/3/2003 | A | NH |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 3/2/2003 at 11:01:05 AM. Contact: ###-####.
|
Pressure Test | 10/30/2002 | 10/31/2002 | 10/31/2002 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/30/2002 at 19:43:02. Contact: ###-####. needs gauge on piping 10/31/2002 11:08:09 AM
|
Pressure Test | 10/31/2002 | 10/31/2002 | 10/31/2002 | P | PASS |
Alan Hauser
|
|
|
Chad, ###-####
|