Final | 2/7/2003 | 2/10/2003 | 2/10/2003 | P | PASS |
Dixie Fellows
|
|
|
call 1st before insp-give 20 min before re-insp-- gary- work ###-####-homeowner ..the door into furn room was removed at time of inspection for comb air 2/10/2003 3:45:51 PM
|
Final | 2/5/2003 | 2/5/2003 | 2/5/2003 | P | NH |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 02/05/2003 at 09:06:15. Contact: ###-####...OFF OVERLAND BEFORE VISTA 2/5/2003 2:25:04 PM DOORS LOCKED..LEFT NOTICE 2/5/2003 3:00:58 PM
|
Final | 2/3/2003 | 2/4/2003 | 2/4/2003 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/03/2003 at 13:43:45. Contact: ###-####.c/n posted. 2/4/2003 12:28:24 PM
|
Rough-in | 12/5/2002 | 12/5/2002 | 12/5/2002 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/05/2002 at 08:32:38. Contact: ###-####. need class 1 duct at bath exhaust...furn flue etc not installed yet..ok to insulate i can check exhaust at next inspection 12/5/2002 3:41:36 PM
|
Rough-in | 12/3/2002 | 12/3/2002 | 12/3/2002 | P | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/03/2002 at 08:43:07. Contact: ###-####...off overland..before vista 12/3/2002 12:42:59 PM appears not ready 12/3/2002 3:49:29 PM
|