Final | 6/12/2003 | 6/12/2003 | 6/12/2003 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 6/12/2003 at 6:31:43 AM. Contact: ###-####.
|
Final | 6/12/2003 | 6/12/2003 | 6/12/2003 | P | PASS |
Alan Hauser
|
|
|
|
Rough-in | 11/11/2002 | 11/12/2002 | 11/12/2002 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/11/2002 at 09:42:05. Contact: ###-####.
|
Rough-in | 11/7/2002 | 11/8/2002 | 11/8/2002 | A | DONE |
Steven Webb
|
|
|
###-#### CONFERNECE not rough-in. 11/8/2002 11:26:08 AM
|
Rough-in | 11/5/2002 | 11/5/2002 | 11/5/2002 | A | FAIL |
Alan Hauser
|
|
|
remove stud that is tight to flue in chase above roof 11/5/2002 6:48:11 PM
|