Final | 5/16/2003 | 5/16/2003 | 5/16/2003 | A | PASS |
Dave Hannah
|
|
|
|
Rough-in | 11/26/2002 | 11/26/2002 | 11/26/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/26/2002 at 08:39:26. Contact: ###-####. ext fireplace ok to cover 11/26/2002 1:36:56 PM
|
Rough-in | 11/20/2002 | 11/20/2002 | 11/20/2002 | P | FAIL |
Dave Hannah
|
|
|
###-#### outside fireplace need claerances around vent piping 11/20/2002 1:39:26 PM
|
Rough-in | 11/7/2002 | 11/8/2002 | 11/8/2002 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/07/2002 at 16:03:48. Contact: ###-####. fire place in the inside r/i ok the one on the ext the framing is being changed will need the reinspect after framing is completed 11/8/2002 2:16:38 PM
|