Final | 2/11/2003 | 2/12/2003 | 2/12/2003 | P | PASS |
Dixie Fellows
|
|
|
###-####
|
Final | 12/10/2002 | 12/11/2002 | 12/11/2002 | A | PART |
Dixie Fellows
|
|
|
MATT ###-#### temp occ ok 12/11/2002 9:10:17 AM
|
Final | 12/10/2002 | 12/10/2002 | 12/10/2002 | P | NR |
Dixie Fellows
|
|
|
kirk; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Final | 12/6/2002 | 12/6/2002 | 12/6/2002 | P | FAIL |
Alan Hauser
|
|
|
replace union in gasline with right/left nipple and coupling 12/6/2002 6:19:43 PM
|
Pressure Test | 11/14/2002 | 11/14/2002 | 11/14/2002 | A | PASS |
Dixie Fellows
|
|
|
###-#### 11/14/2002 7:02:31 AM main 60lb test to roof ok...check regulator clearances to f/a intakes at final 11/14/2002 9:34:55 AM
|
Pressure Test | 11/12/2002 | 11/13/2002 | 11/13/2002 | A | FAIL |
Dixie Fellows
|
|
|
###-#### kirk need btu load on equipment 11/13/2002 11:04:19 AM
|
Pressure Test | 11/13/2002 | 11/13/2002 | 11/13/2002 | P | CANC |
Dixie Fellows
|
|
|
###-#### will reschedule for thurs am 11/14/2002 7:02:45 AM
|
Pressure Test | 11/12/2002 | 11/12/2002 | 11/12/2002 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/12/2002 at 06:58:36. Contact: ###-####. 60lb test kitchen area ok 11/12/2002 2:53:11 PM
|