Final | 12/23/2002 | 12/24/2002 | 12/24/2002 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/23/2002 at 17:48:13. Contact: ###-####. doors locked..nobody on site 12/24/2002 8:59:19 AM
|
Final | 12/24/2002 | 12/24/2002 | 12/24/2002 | P | PASS |
Dixie Fellows
|
|
|
###-#### ALYDIA IF DECIDE TO DO EARLY NO ONE THERE BEFORE 10:30 AM
|
Final | 12/17/2002 | 12/19/2002 | 12/19/2002 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/17/2002 at 23:53:09. Contact: ###-####. temp occ ok..posted corrections 12/19/2002 9:37:11 AM
|
Pressure Test | 12/5/2002 | 12/6/2002 | 12/6/2002 | A | PASS |
Jim Sly
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Pressure Test | 11/22/2002 | 11/22/2002 | 11/22/2002 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/22/2002 at 06:09:44. Contact: 089412315.
|
Pressure Test | 11/22/2002 | 11/22/2002 | 11/22/2002 | P | PART |
Russ Owen
|
|
|
PIPE IN TENNANT WALL AND TRUNK ABOVE ONLY. 11/22/2002 3:47:29 PM
|
Pressure Test | 11/20/2002 | 11/21/2002 | 11/21/2002 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/20/2002 at 22:08:43. Contact: ###-####. 60lb test going into bldg to mezanine ok 11/21/2002 11:20:38 AM
|