Final | 12/12/2002 | 12/13/2002 | 12/13/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/12/2002 at 13:36:09. Contact: ###-####.
|
Pressure Test | 12/2/2002 | 12/2/2002 | 12/2/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/02/2002 at 07:25:28. Contact: ###-####.
|
Rough-in | 12/2/2002 | 12/2/2002 | 12/2/2002 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/02/2002 at 07:25:13. Contact: ###-####. need protection on flex pipe to be checked at framing. 12/2/2002 4:57:46 PM
|