Final | 1/31/2003 | 1/31/2003 | 1/31/2003 | P | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/31/2003 at 8:49:15 AM. Contact: ###-####.
|
Final | 1/31/2003 | 1/31/2003 | 1/31/2003 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/31/2003 at 8:49:15 AM. Contact: ###-####.
|
Pressure Test | 1/30/2003 | 1/30/2003 | 1/30/2003 | P | PASS |
Jim Sly
|
|
|
###-####
|
Rough-in | 11/22/2002 | 11/26/2002 | 11/26/2002 | A | PASS |
Jim Sly
|
|
|
###-#### THIS ALSO NEEDS A PERSSURE TEST
|
Rough-in | 11/22/2002 | 11/25/2002 | 11/25/2002 | A | CANC |
Jim Sly
|
|
|
###-#### Canc by Contr. 11/25/2002 9:36:30 AM
|
Rough-in | 11/22/2002 | 11/22/2002 | 11/22/2002 | P | PASS |
Jim Sly
|
|
|
###-#### mark
|
Rough-in | 11/20/2002 | 11/21/2002 | 11/21/2002 | A | FAIL |
Dixie Fellows
|
|
|
mark - ###-#### screws in b-vent..no duct tape allowed on dryer vent 11/21/2002 9:51:06 AM
|