Final | 11/26/2002 | 11/26/2002 | 11/26/2002 | P | PASS |
Dixie Fellows
|
|
|
plans in the f/p- dick ###-####-re-insp
|
Rough-in | 11/25/2002 | 11/25/2002 | 11/25/2002 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/25/2002 at 09:30:08. Contact: ###-####...off executive..right on five mile..right on mesquite 11/25/2002 1:15:58 PM need manuf specs on site 11/25/2002 2:56:38 PM
|