Final | 1/21/2003 | 1/21/2003 | 1/21/2003 | P | NR |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Veronica England
|
Final | 1/21/2003 | 1/21/2003 | 1/21/2003 | P | PASS |
Russ Owen
|
|
|
|
Rough-in | 12/10/2002 | 12/10/2002 | 12/10/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/10/2002 at 09:17:31. Contact: ###-####.
|
Rough-in | 12/9/2002 | 12/9/2002 | 12/9/2002 | P | NR |
Tom Arcoraci
|
|
|
Phone #: ###-#### Internet Inspection Request from: Michelle Evans talked to installer at site
12/9/2002 3:45:41 PM
|
Pressure Test | 12/6/2002 | 12/6/2002 | 12/6/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/06/2002 at 11:11:12. Contact: ###-####.
|
Rough-in | 12/6/2002 | 12/6/2002 | 12/6/2002 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/06/2002 at 11:10:57. Contact: ###-####. C/N posted. 12/6/2002 2:51:12 PM
|