Final | 2/28/2003 | 3/3/2003 | 3/3/2003 | A | PASS |
Alan Hauser
|
|
|
tamara- ###-####-re-insp
|
Final | 2/28/2003 | 2/28/2003 | 2/28/2003 | P | FAIL |
Alan Hauser
|
|
|
reinspection fee, no access 3/1/2003 12:30:07 AM
|
Final | 2/26/2003 | 2/27/2003 | 2/27/2003 | A | FAIL |
Alan Hauser
|
|
|
need 18" clearance at side cabinets at range 2/27/2003 8:27:11 PM
|
Pressure Test | 12/6/2002 | 12/6/2002 | 12/6/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/06/2002 at 10:31:13. Contact: ###-####.
|
Rough-in | 12/6/2002 | 12/6/2002 | 12/6/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/06/2002 at 10:30:28. Contact: ###-####.
|