Final | 6/9/2003 | 6/10/2003 | 6/10/2003 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 6/9/2003 at 1:04:37 PM. Contact: ###-####.
|
Final | 6/4/2003 | 6/4/2003 | 6/4/2003 | P | FAIL |
Alan Hauser
|
|
|
need upper combustion air opening 6/4/2003 11:44:51 PM
|
Pressure Test | 12/3/2002 | 12/3/2002 | 12/3/2002 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 12/03/2002 at 09:26:38. Contact: ###-####.
|
Pressure Test | 11/27/2002 | 11/29/2002 | 11/29/2002 | P | FAIL |
Alan Hauser
|
|
|
c/n posted at front window 11/29/2002 5:30:20 PM
|
Rough-in | 11/27/2002 | 11/29/2002 | 11/29/2002 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 11/27/2002 at 17:27:19. Contact: ###-####.
|