Final | 1/23/2003 | 1/24/2003 | 1/24/2003 | A | PASS |
Dixie Fellows
|
|
|
CORRECTIONS ARE MADE, RANGE IS AN ELECTRIC UNIT NOT GAS.; Phone #: ###-#### Internet Inspection Request from: Veronica England
|
Final | 1/21/2003 | 1/22/2003 | 1/22/2003 | A | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Veronica England called cont about not being piped for a gas range..dryer exhaust to have smooth interior finish 1/22/2003 5:18:27 PM
|
Rough-in | 12/12/2002 | 12/12/2002 | 12/12/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/12/2002 at 10:24:45. Contact: ###-####.
|
Pressure Test | 12/10/2002 | 12/11/2002 | 12/11/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/10/2002 at 17:48:24. Contact: ###-####.
|
Rough-in | 12/11/2002 | 12/11/2002 | 12/11/2002 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/11/2002 at 09:31:19. Contact: ###-####.
|
Rough-in | 12/10/2002 | 12/11/2002 | 12/11/2002 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/10/2002 at 17:48:10. Contact: ###-####.
|