Final | 12/19/2002 | 12/20/2002 | 12/20/2002 | A | PASS |
Alan Hauser
|
|
|
b j ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Final | 12/13/2002 | 12/13/2002 | 12/13/2002 | P | PART |
Dixie Fellows
|
|
|
GREG; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie R/I OK...NOT READY FOR FINAL 12/13/2002 2:51:28 PM
|
Final | 12/10/2002 | 12/11/2002 | 12/11/2002 | A | FAIL |
Dixie Fellows
|
|
|
###-#### greg need fresh air...seal r/a plenum under dining floor...need info on basement...if a rental furn can't heat both residences 12/11/2002 11:00:38 AM
|
Final | 12/9/2002 | 12/9/2002 | 12/9/2002 | P | FAIL |
Steven Webb
|
|
|
GREG; Phone #: ###-#### Internet Inspection Request from: Darla Downs C/N--Provide c/notice issued on 12/2/02 by inspector 408--Not ready for final. 12/9/2002 1:20:54 PM
|
Final | 12/4/2002 | 12/5/2002 | 12/5/2002 | A | NR |
Alan Hauser
|
|
|
$42 reinspection for 3rd trip for final and not ready 12/5/2002 1:39:39 PM
|
Final | 12/3/2002 | 12/4/2002 | 12/4/2002 | A | NR |
Alan Hauser
|
|
|
called greg 12/4/2002 2:03:54 PM
|
Final | 11/29/2002 | 12/2/2002 | 12/2/2002 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/29/2002 at 16:36:47. Contact: ###-####.
|
Pressure Test | 12/2/2002 | 12/2/2002 | 12/2/2002 | A | PASS |
Tom Arcoraci
|
|
|
|
Rough-in | 12/2/2002 | 12/2/2002 | 12/2/2002 | A | FAIL |
Tom Arcoraci
|
|
|
cn posted at site
|