Pressure Test | 12/6/2002 | 12/9/2002 | 12/9/2002 | A | DONE |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 12/06/2002 at 17:14:12. Contact: ###-####. Gas lines done be Intermountain gas--operational at inspection. 12/9/2002 9:26:20 AM
|
Rough-in | 12/6/2002 | 12/9/2002 | 12/9/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 12/06/2002 at 17:14:02. Contact: ###-####.
|