Final | 3/13/2003 | 3/13/2003 | 3/13/2003 | P | PASS |
Dixie Fellows
|
|
|
brent; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
Final | 3/11/2003 | 3/12/2003 | 3/12/2003 | A | FAIL |
Jim Sly
|
|
|
###-#### Need correct address's 3/12/2003 8:50:19 AM
|
Final | 3/10/2003 | 3/11/2003 | 3/11/2003 | A | FAIL |
Dixie Fellows
|
|
|
Call Travis at ###-#### 1st or Brent at ###-#### to meet you there Internet Inspection Request from: misty evans met with brent ..posted corrections..reinsp fee 3/11/2003 11:24:36 AM
|
Final | 3/6/2003 | 3/7/2003 | 3/7/2003 | A | FAIL |
Dixie Fellows
|
|
|
Call Brent prior to inspecting; Phone #: ###-#### Internet Inspection Request from: misty evans called brent 10:00..no call back 3/7/2003 11:57:20 AM
|
Final | 2/28/2003 | 3/3/2003 | 3/3/2003 | A | FAIL |
Dixie Fellows
|
|
|
call ken at ###-#### 20-30 min prior Internet Inspection Request from: misty evans refer to mec 3706 3/3/2003 9:30:49 AM
|
Final | 2/26/2003 | 2/27/2003 | 2/27/2003 | P | NR |
Russ Owen
|
|
|
call Ralph at ###-#### he will meet you with a ladder Internet Inspection Request from: misty evans. see my notes under mec02-3742. 2/27/2003 4:22:31 PM
|
Rough-in | 12/20/2002 | 12/20/2002 | 12/20/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/20/2002 at 09:56:23. Contact: ###-####.
|
Pressure Test | 12/18/2002 | 12/19/2002 | 12/19/2002 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 12/18/2002 at 16:55:11. Contact: ###-####.
|
Rough-in | 12/18/2002 | 12/19/2002 | 12/19/2002 | A | NR |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 12/18/2002 at 16:54:59. Contact: ###-####.
|