Final | 5/16/2003 | 5/16/2003 | 5/16/2003 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 5/16/2003 at 9:49:54 AM. Contact: ###-####.
|
Rough-in | 1/9/2003 | 1/9/2003 | 1/9/2003 | P | PASS |
Alan Hauser
|
|
|
###-####
|
Rough-in | 12/27/2002 | 12/27/2002 | 12/27/2002 | A | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/27/2002 at 05:47:12. Contact: ###-####.c/n not addressed reinsp. fee due. 12/27/2002 9:33:50 AM
|
Rough-in | 12/24/2002 | 12/24/2002 | 12/24/2002 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/24/2002 at 04:53:40. Contact: ###-####....need flue specs ....emer gas valve....full draft stops at chases. 12/24/2002 10:53:44 AM
|