Final | 3/7/2003 | 3/7/2003 | 3/7/2003 | P | PASS |
Dave Hannah
|
|
|
Please call Allen ###-#### if access code is needed.; Phone #: ###-#### Internet Inspection Request from: Lena Sloan
|
Rough-in | 1/2/2003 | 1/2/2003 | 1/2/2003 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 01/02/2003 at 08:39:04. Contact: ###-####.
|
Rough-in | 12/31/2002 | 12/31/2002 | 12/31/2002 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/31/2002 at 09:22:16. Contact: .
|