Final | 2/24/2003 | 2/24/2003 | 2/24/2003 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 2/24/2003 at 10:34:04 AM. Contact: ###-####...193 2/24/2003 2:09:00 PM
|
Final | 2/20/2003 | 2/20/2003 | 2/20/2003 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 2/20/2003 at 8:37:17 AM. Contact: ###-####. corrections not done..$42.00 fee 2/20/2003 5:25:31 PM
|
Final | 2/14/2003 | 2/18/2003 | 2/18/2003 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 2/14/2003 at 2:11:06 PM. Contact: ###-####.call first to get access code f/p covered by painters..dryer vent to have smooth interior..no access to crawl 2/18/2003 11:35:25 AM
|
Pressure Test | 12/27/2002 | 12/27/2002 | 12/27/2002 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/27/2002 at 08:08:18. Contact: ###-####.
|
Rough-in | 12/27/2002 | 12/27/2002 | 12/27/2002 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/27/2002 at 08:07:38. Contact: ###-####...ORCHARD..LEFT ON MALAD 12/27/2002 12:09:23 PM
|