Final | 2/21/2003 | 2/25/2003 | 2/25/2003 | A | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 2/21/2003 at 9:44:30 AM. Contact: ###-####.--for access call lora or michell ###-####
|
Final | 2/25/2003 | 2/25/2003 | 2/25/2003 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 2/25/2003 at 10:50:22 AM. Contact: ###-####.--call ###-#### for access
|
Rough-in | 1/2/2003 | 1/2/2003 | 1/3/2003 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 01/02/2003 at 10:46:12. Contact: ###-####.
|
Pressure Test | 1/2/2003 | 1/2/2003 | 1/2/2003 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 01/02/2003 at 10:46:36. Contact: ###-####.
|