Final | 2/5/2003 | 2/6/2003 | 2/6/2003 | P | PASS |
Dixie Fellows
|
|
|
for homeowner-julie; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie..DALTON OFF MCMILLAN..RIGHT ON ZUNI 2/6/2003 12:55:29 PM
|
Final | 12/30/2002 | 12/30/2002 | 12/30/2002 | P | FAIL |
Dixie Fellows
|
|
|
darwin- ###-####--call 1st insp POSTED CORRECTIONS...NEED TO READ MANUF SPECS.. 12/30/2002 2:20:20 PM
|
Pressure Test | 12/30/2002 | 12/30/2002 | 12/30/2002 | P | CANC |
Dixie Fellows
|
|
|
darwin-- ###-####--call 1st before insp ..MCMILLAN TO DALTON..RIGHT ON ZONI 12/30/2002 12:51:52 PM DONE BY INT GAS 12/30/2002 2:20:00 PM
|