Final | 10/8/2003 | 10/13/2003 | 10/13/2003 | P | PASS |
Dixie Fellows
|
|
|
###-#### august
|
Pressure Test | 2/12/2003 | 2/12/2003 | 2/12/2003 | P | PASS |
Alan Hauser
|
|
|
PER ALAN
|
Pressure Test | 2/6/2003 | 2/6/2003 | 2/6/2003 | P | FAIL |
Alan Hauser
|
|
|
reinspection fee, no inspections til paid, this is 3rd trip and fail 2/6/2003 11:16:31 PM
|
Final | 1/6/2003 | 1/7/2003 | 1/7/2003 | P | FAIL |
Dixie Fellows
|
|
|
###-#### fireplace late pm..AFTER 3:30 1/7/2003 2:32:36 PM VALVE ON GUAGE NOT WORKING 1/7/2003 4:55:37 PM
|
Final | 12/31/2002 | 12/31/2002 | 12/31/2002 | P | NH |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/31/2002 at 08:44:12. Contact: ###-####.
|