Final | 3/12/2003 | 3/13/2003 | 3/13/2003 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 3/12/2003 at 2:03:28 PM. Contact: ###-####.
|
Rough-in | 1/13/2003 | 1/13/2003 | 1/13/2003 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Carol Rasmusssen
|
Pressure Test | 1/8/2003 | 1/9/2003 | 1/9/2003 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/08/2003 at 15:18:53. Contact: ###-####.
|
Rough-in | 1/8/2003 | 1/9/2003 | 1/9/2003 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/08/2003 at 15:18:39. Contact: ###-####. Horiz B vent more than 75% of vert. 1/9/2003 10:40:30 AM
|