Final | 4/11/2003 | 4/11/2003 | 4/11/2003 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 4/11/2003 at 8:09:22 AM. Contact: ###-####.
|
Rough-in | 1/6/2003 | 1/7/2003 | 1/7/2003 | A | PASS |
Russ Owen
|
|
|
|
Rough-in | 1/5/2003 | 1/6/2003 | 1/6/2003 | P | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/05/2003 at 21:15:18. Contact: ###-####.needs duct connections in attic and mis. 1/6/2003 4:12:45 PM
|
Pressure Test | 1/3/2003 | 1/3/2003 | 1/3/2003 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/03/2003 at 09:59:54. Contact: ###-####. r/i not ready...gas 60lb and 20lb tests ok 1/3/2003 4:27:57 PM
|