Final | 2/24/2003 | 2/24/2003 | 2/24/2003 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 2/24/2003 at 10:09:20 AM. Contact: ###-####.
|
Pressure Test | 1/3/2003 | 1/6/2003 | 1/6/2003 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 01/03/2003 at 16:41:24. Contact: ###-####. Pressure on guage only 7 lbs. Correct and recall. 1/6/2003 10:07:28 AM
|
Pressure Test | 1/6/2003 | 1/6/2003 | 1/6/2003 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 01/06/2003 at 11:20:01. Contact: ###-####.
|
Rough-in | 1/3/2003 | 1/6/2003 | 1/6/2003 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 01/03/2003 at 16:40:56. Contact: ###-####.
|