Final | 2/24/2003 | 2/24/2003 | 2/24/2003 | P | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
Pressure Test | 2/18/2003 | 2/18/2003 | 2/18/2003 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 2/18/2003 at 9:59:06 AM. Contact: ###-####.
|
Pressure Test | 2/13/2003 | 2/13/2003 | 2/13/2003 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 02/13/2003 at 10:11:08. Contact: ###-####.for gas line to f/p
|
Pressure Test | 1/9/2003 | 1/9/2003 | 1/9/2003 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/09/2003 at 10:23:12. Contact: ###-####.
|
Rough-in | 1/9/2003 | 1/9/2003 | 1/9/2003 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/09/2003 at 10:22:33. Contact: ###-####...off orchard left on malad 1/9/2003 1:45:23 PM
|