Final | 4/2/2003 | 4/3/2003 | 4/3/2003 | A | PASS |
Alan Hauser
|
|
|
Please call Christian ###-#### if access code is needed.; Phone #: ###-#### Internet Inspection Request from: Lena Sloan
|
Rough-in | 1/22/2003 | 1/22/2003 | 1/22/2003 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/22/2003 at 09:39:09. Contact: ###-####. int sheet roch shear panels ok 1/22/2003 3:44:28 PM
|
Rough-in | 1/21/2003 | 1/21/2003 | 1/21/2003 | P | FAIL |
Dave Hannah
|
|
|
4 fire places\\###-#### c/n on site 1/21/2003 5:10:09 PM
|