Final | 3/7/2003 | 3/7/2003 | 3/7/2003 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 3/7/2003 at 10:54:22 AM. Contact: ###-####. NO CARD ON SITE 3/7/2003 3:52:42 PM
|
Pressure Test | 1/27/2003 | 1/27/2003 | 1/27/2003 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/27/2003 at 08:19:57. Contact: ###-####...###-#### 1/27/2003 3:54:59 PM
|
Rough-in | 1/23/2003 | 1/24/2003 | 1/24/2003 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/23/2003 at 14:03:38. Contact: ###-####.--for cover insp secondary drain to drain over window 1/24/2003 10:09:41 AM
|
Rough-in | 1/24/2003 | 1/24/2003 | 1/24/2003 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/24/2003 at 10:08:36. Contact: ###-####.--cover insp
|
Rough-in | 1/22/2003 | 1/23/2003 | 1/23/2003 | P | FAIL |
Dixie Fellows
|
|
|
###-#### NEED TO COMPLETE VENTING..PRIMARY AND SECONDARY DRAINS..I LET HIM USE WEBBING AS THIS WAS HIS FIRST COMMERCIAL JOB 1/23/2003 2:26:28 PM
|
Rough-in | 1/21/2003 | 1/22/2003 | 1/22/2003 | A | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/21/2003 at 2:39:30 PM. Contact: ###-####.\\cover only cancelled by cont 1/22/2003 12:38:58 PM
|