Final | 4/1/2003 | 4/2/2003 | 4/2/2003 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 4/1/2003 at 4:43:38 PM. Contact: ###-####.
|
Pressure Test | 2/7/2003 | 2/7/2003 | 2/7/2003 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 2/7/2003 at 7:23:28 AM. Contact: ###-####.
|
Pressure Test | 2/5/2003 | 2/6/2003 | 2/6/2003 | A | FAIL |
Alan Hauser
|
|
|
pressure test on 16 pounds, failed for 2nd time either soap out piping or stay long enough to make sure holding pressure 2/6/2003 8:43:45 PM
|
Pressure Test | 2/5/2003 | 2/5/2003 | 2/5/2003 | P | FAIL |
Alan Hauser
|
|
|
5#'s 2/5/2003 11:56:15 PM
|
Rough-in | 2/5/2003 | 2/5/2003 | 2/5/2003 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 2/5/2003 at 8:33:33 AM. Contact: ###-####.
|