Final | 9/24/2003 | 9/25/2003 | 9/25/2003 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 9/24/2003 at 2:19:19 PM. Contact: ###-####.
|
Final | 6/17/2003 | 6/18/2003 | 6/18/2003 | A | FAIL |
Tom Arcoraci
|
|
|
greg; Phone #: ###-#### Internet Inspection Request from: Darla Downs1111 6/17/2003 10:59:59 PM install protection post per city drawings 6/18/2003 10:01:34 AM
|
Pressure Test | 2/18/2003 | 2/19/2003 | 2/19/2003 | A | PASS |
Alan Hauser
|
|
|
|
Rough-in | 2/18/2003 | 2/19/2003 | 2/19/2003 | A | PASS |
Alan Hauser
|
|
|
###-####
|
Rough-in | 2/13/2003 | 2/14/2003 | 2/14/2003 | P | FAIL |
Dave Hannah
|
|
|
###-#### greg c/n items not completed pressure test failed duct work not hooked to fans mec chase not fire blocked 2/14/2003 2:08:15 PM
|
Pressure Test | 1/22/2003 | 1/23/2003 | 1/23/2003 | A | FAIL |
Alan Hauser
|
|
|
john ###-####
|
Rough-in | 1/22/2003 | 1/23/2003 | 1/23/2003 | A | FAIL |
Alan Hauser
|
|
|
john ###-#### c/n on site at furnace 1/23/2003 9:04:46 PM
|