Final | 3/20/2003 | 3/20/2003 | 3/20/2003 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/20/2003 at 11:07:45 AM. Contact: ###-####. 193 enter 3/20/2003 9:20:27 PM
|
Pressure Test | 1/31/2003 | 2/3/2003 | 2/3/2003 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 1/31/2003 at 11:32:34 AM. Contact: ###-####.
|
Pressure Test | 1/31/2003 | 1/31/2003 | 1/31/2003 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/31/2003 at 10:25:51. Contact: ###-####.--cancel per sharon--
|
Rough-in | 1/31/2003 | 1/31/2003 | 1/31/2003 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/31/2003 at 10:25:10. Contact: ###-####.no gas test/ check back of b vent to roofing clearance/ struc at hood vent will need modified at framing insp. 1/31/2003 3:38:22 PM
|