Final | 3/13/2003 | 3/14/2003 | 3/14/2003 | P | PASS |
Dixie Fellows
|
|
|
Internet Inspection Request from: Sherri Petterson
|
Final | 3/7/2003 | 3/10/2003 | 3/10/2003 | P | FAIL |
Dixie Fellows
|
|
|
Internet Inspection Request from: Sherri Petterson strap 12" with 12 guage wire above offices...need disconnect and outlet at same furnace 3/10/2003 3:07:14 PM
|
Final | 3/5/2003 | 3/6/2003 | 3/6/2003 | A | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Sherri Petterson talked to lonnie about duct support 3/6/2003 5:13:53 PM
|
Final | 2/24/2003 | 2/25/2003 | 2/25/2003 | A | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Sherri Petterson need duct to diffusers..duct detectors..access to equipment...etc 2/25/2003 11:06:23 AM
|
Conference | 2/10/2003 | 2/11/2003 | 2/11/2003 | A | DONE |
Dixie Fellows
|
|
|
###-#### talked with bob about corrections 2/11/2003 6:05:37 PM
|
Rough-in | 2/7/2003 | 2/10/2003 | 2/10/2003 | A | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Trina Stracener..waiting for bob to call me back..need seperate permit for bail-bond office..complete bath exhaust..condensate on front furn? 2/10/2003 4:56:27 PM
|
Pressure Test | 2/3/2003 | 2/4/2003 | 2/4/2003 | A | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Trina Stracener....DUSTIN...###-#### 2/4/2003 8:59:49 AM
|
Rough-in | 2/4/2003 | 2/4/2003 | 2/4/2003 | P | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Trina Stracener
|