Final | 3/27/2003 | 3/27/2003 | 3/27/2003 | P | PASS |
Dixie Fellows
|
|
|
robin; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Final | 3/26/2003 | 3/26/2003 | 3/26/2003 | P | FAIL |
Dixie Fellows
|
|
|
ROBIN; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie POSTED CORRECTIONS..WILL REVIEW MEC ROOM ON NEXT INSP WITH ROBYN 3/26/2003 3:36:09 PM
|
Rough-in | 3/17/2003 | 3/17/2003 | 3/17/2003 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 3/17/2003 at 7:14:34 AM. Contact: ###-####. ok to cover ceiling 3/17/2003 12:23:18 PM
|
Rough-in | 2/5/2003 | 2/6/2003 | 2/6/2003 | A | PART |
Dixie Fellows
|
|
|
###-#### OK TO COVER CEILING ABOVE GAMES AND BATHROOMS..WILL CHECK SECONDARY DRAIN ON UPSTAIRS 90% FURNACE 2/6/2003 11:47:20 AM
|