Final | 4/15/2003 | 4/16/2003 | 4/16/2003 | A | PASS |
Alan Hauser
|
|
|
lars ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
Rough-in | 2/5/2003 | 2/5/2003 | 2/5/2003 | P | PASS |
Alan Hauser
|
|
|
lars; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Rough-in | 2/3/2003 | 2/4/2003 | 2/4/2003 | A | FAIL |
Dave Hannah
|
|
|
out of time 2/3 pm c/n on site everything ok but for gas pipe sizing need btu out put on units run sizing calcs for gas piping leave pressure on piping if sizing is ok call in pressure test 2/4/2003 12:28:56 PM
|
Rough-in | 2/3/2003 | 2/3/2003 | 2/3/2003 | A | CANC |
Jim Storey
|
|
|
###-#### LARS ###-#### LARS out of time 2/3 pm 2/3/2003 6:17:00 PM
|