Final | 6/2/2003 | 6/2/2003 | 6/2/2003 | P | PASS |
Dave Hannah
|
|
|
###-####
|
Pressure Test | 2/24/2003 | 2/25/2003 | 2/25/2003 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 2/24/2003 at 4:00:40 PM. Contact: ###-####.
|
Pressure Test | 2/21/2003 | 2/24/2003 | 2/24/2003 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 2/21/2003 at 3:38:14 PM. Contact: ###-####.
|
Rough-in | 2/21/2003 | 2/24/2003 | 2/24/2003 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 2/21/2003 at 3:37:44 PM. Contact: ###-####.
|
Pressure Test | 2/21/2003 | 2/21/2003 | 2/21/2003 | P | NR |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 2/21/2003 at 7:42:56 AM. Contact: ###-####.
|
Rough-in | 2/21/2003 | 2/21/2003 | 2/21/2003 | P | FAIL |
Alan Hauser
|
|
|
c/n posted at front window to the left of door 2/21/2003 10:22:47 PM
|