DOC - Permit Finaled | | | 12/11/2003 | | DONE |
|
|
|
|
Final | 4/3/2003 | 4/4/2003 | 4/4/2003 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 4/3/2003 at 3:16:26 PM. Contact: ###-####.
|
Pressure Test | 2/11/2003 | 2/11/2003 | 2/11/2003 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/11/2003 at 11:15:05. Contact: ###-####.
|
Rough-in | 2/11/2003 | 2/11/2003 | 2/11/2003 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/11/2003 at 11:14:47. Contact: ###-####.
|